AWWA ACE95049

AWWA ACE95049 From Model to Full Scale: Modification of a Reservoir to Improve Contact Time

Conference Proceeding by American Water Works Association, 01/01/1995

Teffy, Susan; Shaver, Robert

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$10.56

$24.00

(price reduced by 56 %)

Full Description

Like many utilities using surface water, ACWD is faced with the challenge of meeting the disinfection requirements of the Surface Water Treatment Rule while also minimizing disinfection byproduct formation. These two competing objectives were motivation behind this plant modification project. This paper discusses the proposed modifications, describes the modeling study and results, and details the implementation of the full-scale modification process. The full-scale project involved modifications to the treated water reservoir, new processes for continuous sampling (upstream and downstream), and comprehensive test and start-up plans.

Contact us