DOXPUB 11-0073-SOP
standard published 08/01/2007 by Doxpub, Inc.
standard published 08/01/2007 by Doxpub, Inc.
Summary:
Describes routine preventative maintenance and unscheduled (failure-related) maintenance procedures for the 120 Liter Reactor. Applicable to process development and manucturing systems. Includes provisions for vessel inspections and 6-month maintenance, valve inspection and diaphragm replacement, drain pump inspection and maintenance, uninterruptable power supply functional check, pH probe care and maintenance, and failure-related maintenance procedures.
Included Sections:
Purpose, Scope, Responsibility, References and Applicable Documents, Materials and Equipment, Health and Safety Considerations, Documentation Requirements, and Procedures
Included Attachments/Appendices:
119 Liter Reactor Maintenance Record, 120 Liter Reactor Spare Parts
About This Document:
This is not a generic template, it's a 10-page procedure that was actually created and used in the Facilities & Equipment operations of a FDA-regulated establishment. The company-specific information (names, addresses, some images, proprietary product information, etc.) has been redacted but the content and format have been largely preserved.
Reasons to Buy:
Use it as a starting point for your own documentation projectCompare the quality of your documents against your industry peersLearn what other companies in your industry are actually doingWho Will Benefit:
Manufacturing PersonnelFacilities ManagersLaboratory Personnel