The concrete craftsman can greatly influence the quality, durability, and appearance of the finished product. This manual from the ACI Concrete Craftsman Series presents information on concrete that should be useful to concrete craftsmen and deals mainly with construction practices relating to slabs-on-ground. This information can be used to train concrete craftsmen and is especially useful for those interested in earning credentials as ACI certified finishers.

Information in this manual is a guide to good practice but does not supersede the provisions in the plans and specifications for any project. If provisions in the plans and specifications vary from the guidance given in this manual, discuss the variances with the design professional. For more detailed information, also read ACI 302.1R, Guide for Concrete Floorand Slab Construction, and other documents listed in the reference section of this manual. Prior editions of this manual included a considerable amount of information on concrete materials and testing. For expanded coverage of materials and testing information, the reader is referred to The Contractos Guide to Quality Concrete Construction (ASCC-1), published jointly by the American Society of Concrete Contractors (ASCC) and ACI.

This manual was first issued under the guidance of the ACI Educational Activities Committee in 1982 as the first book in the ACI Concrete Craftsman Series. A second edition was approved and issued in 1994. Since1987, when ACI launched the Concrete Flatwork Finisher/Technician certification program, ACI has been using this document as the primary reference for that program. The certification program was designed to provide a basis for certifying concrete finishers and to improve the quality of concrete construction. As a result of program growth, more than 7500 people have become certified Concrete Flatwork Finishers/Technicians.Some major retailers now specify that contractors constructing concretefloors for their stores have certified ACI Flatwork Finishers on site performing the work.

ACI Committee 301, Specifications for Concrete, took a major step toward formally recognizing the value of using ACI-certified finishers and technicians when, in 2002, they approved language in ACI 301, Specifications for Concrete,that states in part, ...Unless otherwise permitted, a minimum of one finisher or finishing supervisor shall be a certified ACI Flatwork Finisher/Technician or a certified Flatwork Technician as defined in ACI CP-10 or equivalent. This was the first time ACI Committee 301 had included language requiring the use of qualified flatwork finishers for concrete placement.

ARCOM, a partner of the American Institute of Architects, also includes optional language in their MASTERSPEC Specification System requiring cast-in-place concrete installers to be certified ACI Flatwork Finishers and Technicians, and installer supervisors to also be certified ACI Flat-work Technicians.




People Who Bought This Also Bought:
ASHRAE 62.1-2007- Standard 62.1-2007 -- Ventilation for Acceptable Indoor Air Quality (ANSI Approved)SMACNA 1108- Accepted Industry Practice for Industrial Duct Construction, 2nd Edition
Contents:

Chapter 1--Planning for slab-on-ground placement, p. CCS-1--3

Introduction

Specification requirements

Determining the size of concrete placements

Ordering concrete

Concrete delivery

Equipment

Size of placing and finishing crews

Preconstruction meeting

Chapter 2--Concrete materials, mixture proportioning, and control tests, p.CCS-1--9

Portland cements

Supplementary cementitious materials

Blended cements

Aggregates

Maximum size of aggregate

Aggregate grading

Harmful substances in aggregate

Mixing water

Admixtures

Mixture proportioning

Control tests

Chapter 3--Preparation before placing concrete, p. CCS-1--19

Subgrade preparation

Compaction around buried pipes and excavations

Establishing grades

Placement sequence

Setting side forms and screed guides

Vapor retarders or barriers

Reinforcement for shrinkage control

Bulkheads and jointing

Checklist of tools and materials

Chapter 4--Floor flatness and levelness, p. CCS-1-23

Measuring floor flatness and levelness

The 10 ft (3 m) straightedge method

F-number system



Factors affecting floor flatness and levelness

Chapter 5--Placing equipment, p. CCS-1--27

Placing concrete directly from truck mixers

Manual or motorized buggies

Crane and bucket

Concrete conveyors

Concrete pumps

Chapter 6--Placing and finishing tools and equipment, p. CCS-1--33

Spreading tools

Consolidating or vibrating tools

Laser-guided screeds

Hand screeding tools

Tools for smoothing after screeding

Jointing and edging tools

Hand floats and trowels

Power floats and trowels

Power saws

Chapter 7--Procedures for finishing slabs-onground, p. CCS-1--39

Striking off (screeding) the concrete

Bull floating or darbying

Highway-type straightedging

Waiting period

Edging and jointing

Brooming

Floating

Troweling

Machine float and trowel direction and patterns

Floating-to-troweling sequence

Finishing when setting time varies from load to load

Floating edges

Walk-behind basics

Hand floating and troweling

Blade tilt

Chapter 8--Jointing, p. CCS-1--49

Isolation joints

Contraction joints

Construction joints

Joint filling

Chapter 9--Curing and protection of concrete, p. CCS-1--55

Importance of curing

When to start curing

Curing methods

Effects of high temperatures on concrete

Causes and prevention of plastic shrinkage cracking

Effects of low temperatures on concrete

Chapter 10--Finishing problems and possible solutions, p. CCS-1--61

Excessive or insufficient bleeding

Slow setting

Surface crusting

Blistering

Delamination

Fast setting

Erratic setting

Sticky concrete

Rained-on surfaces

Random cracking

Craze cracking

Discoloration

Dusting

Curling

Scaling

Contact us