CII RS214-1

CII RS214-1 Trade-Off between Cost and Schedule

standard by Construction Industry Institute, 01/01/2007

More details

Download


$40.00

Full Description

Choosing between cost and schedule options can occur many times throughout a project's life cycle. This publication describes a decision support tool, the Cost Schedule Trade-Off Tool, which assists in selecting from 23 optimum techniques depending on the phase of a project. Includes case study summaries and introduces the Microsoft Excel-based CSTT as means to prioritize techniques based on their effectiveness.

NOTE: Actual tool included with IR214-2.

Contact us